close
+86 13527814016
info@gzhaisan.com
Search
Guangzhou Haisan Amusement Technology Co., Ltd.

Design for quality water park

Design for quality water park

Park planning

Before starting the construction of water parks, we should first look for water park equipment manufacturers to do planning scheme, and then arrange the equipments of the water park legitimately according to the actual situation. In the construction of the water park, there should be enough areas for tourists to rest in the shade, areas for business meals, and supporting areas for landscaping. After two or three years of operation, the water park must have new water park equipment to support its sustainable development.

Choices of the equipments

There should be a lot of water park equipment investors like to buy foreign equipment, spend a lot of money to buy imported fiberglass water slide. However, there is not insufficient attention paid to the system equipment to ensure the normal operation of the equipment: the steel structure supporting the fiberglass water slide is selected by inexperienced and undigesting manufacturers, and the drawings of equipment suppliers are transformed at low prices, so the good connection between the fiberglass water slide and the steel structure cannot be guaranteed. The mechanical and electrical products used in the water supply system are of poor quality and cannot provide stable and sufficient water; Machine room is not ventilated, do not pollute, and can not do waterproof even etc. Without sufficient funds to guarantee the normal use of imported equipment, there is no need to spend a lot of money on imported products.

Design for water park

The integrity and accuracy of the water park design is particularly important. One of the biggest differences between water parks and other theme parks is that the systems that keep the water rides running are hidden underground. In the design, full consideration must be given to the management system of the whole park, water supply and drainage system, electromechanical control system of water supply for each equipment, water treatment system, design of each machine room, design of each sink, coordinate size of each equipment foundation, and mutual position should be clear. Reasonable allocation of tourists moving line, set up the corresponding shopping, catering, rest and public facilities.

Related News
Online Servicetq_online