The rapid development of the water park industry has led to the presence of water parks of all sizes throughout the country, making it no longer a new and fresh concept for visitors. Therefore, the era where success could be achieved simply by filling the regional gap and taking the initiative is gone forever. Today, the water park industry has entered a period of fierce competition where only the strong survive. So, how can water park project improves their profitability in the future?
Extend the Opening Time of Aqua Park Project
The peak season for water park operations is generally three months in summer, which is influenced by the season, but the demand for water parks arises because of the season. Although indoor water parks can effectively extend the playtime, visitors don't usually visit them other than in summer. Therefore, it is not wise to achieve year-round operation by creating expensive indoor water park project, which has limited customer traffic and extended operation times beyond the summer season.
Increase Customer Traffic in the Peak Season of Aqua Park Project
Currently, the customer traffic in the peak season of water parks has reached saturation point, and the suitable time for outdoor water park project activities is from July to September every year, and is affected by temperature to the extent that activities cannot be conducted during other times, thus limiting the extension of the opening time. The best way to solve the seasonality of water parks is to construct a large indoor water park and extend water activities through temperature control, but this will dramatically increase costs and the indoor water park will be limited by space, making it impossible to attract new customers by adding new water facilities.
Changes in the Season of Aqua Park Project
It is a common sense that people have no need to play in the water other than in summer, when they bathe every day. In winter, they may only bathe once a week, and when the weather is good in spring and autumn, people crave outdoor activities. Therefore, water park practitioners should not focus on extending water playtime through indoor means.
Add New Themes to Water Park Project
Adding new themes is a good way to attract new visitors and keep old ones. Look for water park equipment manufacturers with excellent equipment and timing to add new equipment and themes. This will solve the huge losses caused by water park project idle land, personnel, and equipment, and is a way to accomplish the transformation of the water park industry.
"Resurrect" The Amusement Facilities of the Original Water Park Project
The main facilities of the water park are children's water houses, large water slides, tidal pools, and drift rivers. These amusement facilities are the main equipment of water parks, with large investments and land areas, and rich experiences, but are limited by water. If these facilities can be revived, the water park will have the foundation of year-round operation. Take full advantage of the characteristics of the original equipment, add new experiences, and revive the equipment, which can create new freshness compared with summer.